Southbend HDG-24-M User Manual Page 16

  • Download
  • Add to my manuals
  • Print
  • Page
    / 52
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 15
INSTALLATION HEAVY DUTY COUNTERLINE
PAGE 16 OWNERS MANUAL 1182845 REV 8
INSTALLATION
Figure 11
N
O
M
K
K
L
L
J
I
P
I
J
H
H
P
7. Check the partially assembled stand to make sure that the legs are straight and that all corners are
square. Now tighten all bolts, but do not over tighten.
8. If legs with casters were ordered, lift the stand and screw the caster assemblies into the bottom of the
legs. The two casters with wheel-locks go on the front corner legs. After the stand is assembled,
connect the required restraint to protect the flexible gas connection (see Step 3 on page 17).
9. If the optional shelves were ordered (items “K”), position them on top of the bottom braces. The down-
flange edge of each shelf should be on the front side of the stand. The shelves simply rest on the
bottom braces (they are not bolted or screwed to the braces).
10. Position the front and rear top supports (items “L”) over the legs. The pre-drilled holes should face the
outside of the stand to line up with the threaded-insert holes near the top of the legs. Use the six 5/8"
hex-head bolts (items “M”) to secure the top supports to the legs.
11. Attach the angle support brackets (item “N”, shipped with the griddle) to the bottom of the of the griddle
using #10x1/2" sheet metal screws (item “O”, also shipped with the griddle).
12. Place the griddle on top of the stand, making sure that the angle brackets that you just installed on the
bottom of the griddle are inserted into the front and rear top supports. No additional bolts or screws are
required. Lift the griddle only at the ends, never in the middle!
13. Go on to Step 4 on page 18.
Page view 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 51 52

Comments to this Manuals

No comments